Applications Print E-mail
background1

INDUSTRIAL:

A typical 200 kW system for a Milk Processing Plant includes 100 kW of PV Panels and 100 kW of Hot Water. This system generates water temperatures up to 170 degrees Fahrenheit.

 COMMERCIAL:

 T10K Hybrid for

Commercial Buildings  

T10K PV For

Commercial Buildings 

  • $70,000 Installed (Before Rebate)
  • Tax Rebate: $21,000
  • Net Price: $49,000
  • Generates 10,000 Watts of Electricity
  • Generates 7,000 Watts of Hot Water
  • Energy Savings: ~ $500 per month
  • PV Panels only Installed: $55,000
  • Requires 1500sq.ft of Roof top
 
  • $50,000 Installed (Before Rebate)
  • Tax Rebate: $15,000
  • Net Price: $35,000
  • Generates 5,000 Watts of Electricity
  • Energy Savings: ~ $180 per month
  • Requires 1500sq.ft of Roof top
  • Produces no hot water

RESIDENTIAL:

 T5K Hybrid For

Residential Buildings 

  T5K PV For

Residential Buildings 

  • $30,000 Installed (Before Rebate)
  • Tax Rebate: $9,000
  • Net Price: $21,000
  • Generates 5,000 Watts of Electricity and 
  • Generates 2,500 Watts of Hot Water
  • Energy Savings: ~ $250 per month
  • PV Panels only Installed: $25,000
  • Requires 1500sq.ft of Roof top
 
  • $25,000 Installed (Before Rebate)
  • Tax Rebate: $7,500
  • Net Price: $17,500
  • Generates 5,000 Watts of Electricity
  • Energy Savings: ~ $180 per month
  • Requires 1500sq.ft of Roof top
  • Produces no hot water